The project includes the establishment of the intersection of multi-level (( 4 levels)) at the junction of Airport Road with a Marj Al-Hammam / Street Arafat road. The project includes the construction of a road with six lanes which is approximately 1.6 km long. This includes; upper bridge 270 m length and two tunnels under the airport road with entry and exit lanes in addition it is required to re-create almost 1.3 km from "the airport road. Moreover the work also includes the establishment of the necessary protections phrases and providing the required road signs with the required traffic safety and lighting works/drainage/and rainwater network construction. The Project construction work includes cut and fill work together with constructing road layers which includes; subgrade, granular sub-base, crushed aggregate base course and binder/wearing courses. Furthermore the project includes concrete works that is required for the curvets, box curvets/pavements and other miscellaneous work like elements of safety and road painting